Galaxy Fibre Brings 100% Fibre Internet to North Cobalt

Table of Contents

Galaxy Fibre Brings 100% Fibre Internet to North Cobalt

Last updated: October 16, 2026

Galaxy Fibre’s 100% fibre-to-the-home internet is now available in North Cobalt, part of the City of Temiskaming Shores, Ontario. As of October 8, 2026, North Cobalt homes can sign up for symmetrical speeds up to 2 Gbps. Every plan has unlimited usage, and you don’t need a contract.

We confirm service one address at a time. To see what your home can get, check if fibre is available at your address.

What’s changing for North Cobalt homes

A fibre line to the house changes two things you’ll notice every day. Your connection stays steady when the whole family is online. And you can send things out as fast as you bring them in.

Fibre that runs all the way to your home

Plenty of internet connections use fibre for part of the trip. With fibre to the node (FTTN), the fibre stops at a cabinet down the street. Older copper phone lines carry the signal the rest of the way. Cable internet uses coaxial lines for that last stretch.

That last stretch is where speeds tend to slip. Copper loses speed over distance, and homes along a cable line share its capacity.

Fibre to the home (FTTH) runs fibre straight to your house, with no copper section to slow it down. If you’d like the longer version, here’s the difference between fibre to the node and fibre to the home.

Upload speeds that match your download speeds

Every Galaxy Fibre plan is symmetrical. On Fibre 500, you get speeds up to 500 Mbps down and up to 500 Mbps up.

Uploads do more work than most people realize. A video call sends your camera feed out while it brings everyone else’s in. Students upload assignments and recorded presentations, and phones back up photos in the background. On a slow upload, any one of those can freeze a call in the next room.

Working from home? Here’s what internet speed you need to work from home.

Galaxy Fibre plans in North Cobalt

Three plans run over the same 100% fibre connection. The prices below are as of October 8, 2026, and the lower price on each plan is a limited-time launch offer.

PlanSpeed, download and upload (up to)DevicesLaunch priceRegular price
Fibre 500500 Mbps15+ devices$69/month$99/month
Fibre 10001,000 Mbps30+ devices$79/month$109/month
Fibre 20002,000 Mbps (2 Gbps)100+ devices$99/month$129/month

Prices can change. For full plan details, see the fibre internet plans in Haileybury and Temiskaming Shores.

What every plan includes

  • Unlimited monthly usage
  • No contract required
  • Free installation
  • A free Wi-Fi 6 modem
  • Two years of price protection, saving $30 a month for 24 months

A live TV streaming add-on, RallyTV, is also available on any plan.

How to check if fibre is available at your address

We confirm coverage home by home, so the address checker is the place to start.

  1. Open the sign-up page: go to galaxyfibre.ca/sign-up/.
  2. Enter your service address: include the street number, street name, community and postal code.
  3. Pick a plan: if fibre has reached your address, choose your plan and sign up online.

If your address isn’t connected yet, you can leave your details for project updates on the Haileybury page. Prefer to talk it through? Call 1-877-727-3448.

What installation looks like

Installation is free on every plan, and it happens in three stages after you sign up.

  1. A call from customer care: the team phones you to walk through the next step for your address.
  2. Site survey and fibre connection: a technician surveys your property, maps the route for the fibre line, and books a date to connect it to your home. Work on your property only starts once you’ve signed up and the survey is done.
  3. In-home setup: the team installs a small fibre terminal where the line comes in, then sets up your Wi-Fi 6 modem.

Timing depends on your address. Customer care confirms your dates when they call.

About the North Cobalt fibre network

North Cobalt is one of the communities that make up the City of Temiskaming Shores. The old Village of North Cobalt sat in Bucke Township, which joined the Town of Haileybury in 1971. In 2004, Haileybury, New Liskeard and Dymond Township amalgamated to form Temiskaming Shores. The City keeps a short history of Haileybury and North Cobalt if you’d like the longer story.

The fibre in North Cobalt is part of Ontario NorthNET, an open-access network across Temiskaming Shores. Community Network Partners (CNPI) built it through Ontario’s Accelerated High-Speed Internet Program (AHSIP). Galaxy Fibre is the internet provider on that network. Sign-up, installation and support for North Cobalt homes all come through us.

Galaxy Fibre also serves homes in other Ontario and Alberta communities. You can see all communities Galaxy Fibre serves on one page.

Frequently asked questions

Is fibre internet available in North Cobalt?

Yes. As of October 8, 2026, Galaxy Fibre’s 100% fibre-to-the-home internet is available to homes in North Cobalt, Temiskaming Shores. We confirm coverage address by address, so check yours on the sign-up page.

How fast is Galaxy Fibre’s internet in North Cobalt?

Plans offer speeds up to 500 Mbps, 1,000 Mbps or 2,000 Mbps (2 Gbps). Every plan is symmetrical, so upload speeds match download speeds.

How much does fibre internet cost in North Cobalt?

As of October 8, 2026, launch prices are $69 a month for Fibre 500, $79 for Fibre 1000 and $99 for Fibre 2000. Regular prices are $99, $109 and $129 a month.

Is there a contract or a data cap?

You don’t need a contract, and every plan includes unlimited monthly usage. Installation and a Wi-Fi 6 modem are free.

How do I check if my home can get Galaxy Fibre?

Enter your address at galaxyfibre.ca/sign-up/ or call 1-877-727-3448. The checker shows whether fibre has reached your home and lets you choose a plan if it has.

Is North Cobalt part of Temiskaming Shores?

Yes. North Cobalt joined Haileybury in 1971. Haileybury then merged with New Liskeard and Dymond Township in 2004 to form the City of Temiskaming Shores.

Ready to see what your home can get? Check availability or call 1-877-727-3448.

Join the Galaxy Fibre Newsletter

Get the latest promos, deals, giveaways & updates of Galaxy Fibre!

More Blogs

Galaxy Fibre Brings 100% Fibre Internet to North Cobalt
Read more
Satellite vs. Fibre Internet: What’s Better for Your Needs?
Read more
Galaxy Fibre Connects First Customers in York Region in Partnership with YorkNet
Read more
White River: Galaxy Fibre’s Visit to The Birthplace of the Real Winnie the Pooh
Read more
The Best 5 TV Packages in Brooks, Alberta
Read more
Why is My Internet so Slow? Halloween Short Stories
Read more
Canada's Best High-Speed Internet Plans of 2023
Read more
Gaming & Your Internet Connection: 22 Common FAQs Answered
Read more
Alexa vs. Google Home: The Ultimate Smart Home Showdown
Read more
Exploring the Many Alternatives to Cable TV in Canada For 2023
Read more
The Technology Behind Fibre Optic Internet 
Read more
Internet Safety Tips to Keep Your Kids Secure Online
Read more
Fibre Optic Cables: A High-Speed Internet Revolution and an Unexpected Earthquake Detector
Read more
Cybersecurity 101: Staying Safe Against The Rising Tide of Cyberattacks in Canada
Read more
Gaming and Internet Speed: A Guide for Casual and Competitive Gamers
Read more
Is Cable Worth It? 5 Reasons to Cut the Cord
Read more
What's the Best Internet Speed When Working from Home?
Read more
A Brief Guide to Making Your House a Smart Home
Read more
Does Fibre Optic Internet Increase Property Value? 
Read more
The Best Internet & TV Package in Canada
Read more
What Is a Vpn and Why Do People Use It?
Read more
The 10 Most Anticipated Video Games of 2023
Read more

Fibre Network Access Agreement Terms & Conditions

1) Grant of permission

You grant Community Network Partners Inc., together with its affiliates, contractors, and utility partners (“CNPI”), a non-exclusive, revocable permission to enter the property with personnel, tools, and machinery to:

  1. a) complete a site assessment and submit statutory utility locate requests, where required; b) install underground fibre-optic facilities from the road allowance or public right-of-way to a demarcation point at the premises, and install any required indoor and/or outdoor demarcation equipment; c) test, operate, access, maintain, repair, replace, relocate, or remove CNPI facilities on reasonable notice; and d) restore disturbed areas following construction.

2) Scope & Installation Methods

Work may include trenching, boring, directional drilling, and/or placement through existing conduit or pathways, where feasible, and may occur over multiple visits. Final route and installation method may change due to utility locates, field conditions, permitting, municipal requirements, or safety considerations. CNPI will follow industry best practices and use existing pathways where reasonably possible.

3) Facilities Ownership

All fibre, conduit, drop cables, and demarcation equipment installed by or for CNPI remain the property of CNPI or its partners, and do not become fixtures.

4) Restoration

CNPI will restore disturbed areas to a substantially similar condition, season and weather permitting. Temporary restoration may be completed first, with final restoration performed when conditions allow. Certain surfaces, including sod, asphalt, concrete, interlock, or landscaping, may require temporary patching before final restoration is completed.

5) Landscaping & Surface Features (Private Property)

You acknowledge that underground installation may require limited disturbance to lawns, gardens, driveways, walkways, or other surface features in order to complete the work safely and efficiently. CNPI will make reasonable efforts to minimize disruption and restore affected areas in accordance with Section 4.

6) Utility Locates & Private Lines

CNPI will obtain statutory utility locates where required. You must identify and clearly mark any private or unregistered lines, systems, or structures on the property, including but not limited to sprinklers, landscape lighting, private hydro lines, invisible fencing, irrigation, septic systems, private drains, shallow utility lines, or similar features. CNPI is not responsible for damage to unmarked or incorrectly marked private facilities.

7) Third-Party Infrastructure & Permissions

This permission does not grant rights over third-party lands, infrastructure, or municipal assets outside the property boundary. Any required permissions, permits, or approvals relating to the public right-of-way or third-party infrastructure will be obtained by CNPI as required. You authorize work and equipment placement on your property only.

8) No Service Commitment

This consent does not obligate you to purchase services. It authorizes construction so that service may be made available to the premises.

9) Access Windows

Work will occur during reasonable hours. CNPI may access the property at any time in the event of an emergency involving safety, service continuity, or network integrity. CNPI will provide reasonable notice for non-emergency visits where practical.

10) Indemnity & Liability

CNPI is responsible for direct, provable physical damage caused by CNPI’s negligence. CNPI is not liable for indirect, consequential, incidental, or special damages, and is not liable for damage to unmarked or incorrectly marked private facilities. Nothing in these Terms limits liability for gross negligence or wilful misconduct.

11) Term; Revocation

This permission remains in effect through installation and while CNPI facilities serve the premises. You may revoke this permission on 30 days’ written notice, except where access is required to maintain, repair, or safely remove facilities. This permission is not an easement or other interest in land.

12) Assignment / Subcontractors

CNPI may assign this permission to its affiliates and may use authorized contractors or subcontractors to perform the work.

13) Privacy & Contact

Information is collected to plan locates, schedule, and perform installation and maintenance, and may be shared with contractors, utility owners, municipalities, and infrastructure partners for those purposes. A copy of your submission will be emailed to you.

14) Governing Law

Province of Ontario.

Fibre Network Access Agreement - Terms & Conditions

1) Grant of Licence
You grant Community Network Partners Inc., together with its affiliates, contractors, and utility partners (“CNPI”), a non-exclusive, revocable licence to enter the property with personnel, tools, and machinery to:
a) complete site assessment and submit statutory utility locate requests (as required);
b) install fibre-optic facilities from the road allowance/public right-of-way and/or utility pole to a demarcation point at the premises and install any required indoor/outdoor demarcation equipment;
c) test, operate, access, maintain, repair, replace, relocate, or remove CNPI facilities on reasonable notice; and
d) restore disturbed areas following construction.

2) Scope & Installation Methods (Underground and Aerial)
Underground: Work may include trenching and/or directional drilling/boring and may occur over multiple visits. Final route and method may change due to utility locates, field conditions, permitting, or safety. CNPI will follow industry best practices and use existing paths or conduit where feasible.
Aerial: Where available/appropriate, CNPI may install an aerial drop from a utility pole to the premises and attach approved hardware (anchors/brackets) to the exterior to support the drop and demarcation equipment. If a temporary surface drop is used before final placement/burial, it will be positioned to minimize disruption and replaced/relocated as soon as practicable.

3) Facilities Ownership
All fibre, conduit, drop cables, and demarcation equipment installed by or for CNPI remain the property of CNPI (or its partners) and do not become fixtures.

4) Restoration
CNPI will restore disturbed areas to a substantially similar condition (season/weather permitting). Temporary restoration may be completed first, with final restoration performed when conditions allow.

5) Vegetation & Pruning (Private Property)
You authorize CNPI to perform minimal trimming/pruning of private vegetation that interferes with safe placement of aerial or buried facilities on the property. Public right-of-way vegetation work follows applicable municipal/utility rules.

6) Utility Locates & Private Lines
CNPI will obtain statutory utility locates where required. You must identify and mark any private/unregistered lines or structures (e.g., sprinklers, private hydro to sheds, invisible fence, septic, private water/gas lines, drains, irrigation, etc.). CNPI is not responsible for damage to unmarked or incorrectly marked private facilities.

7) Poles & Third-Party Infrastructure
This licence does not grant rights on third-party poles/structures. Any required pole/strand permissions will be obtained by CNPI from the infrastructure owner. You authorize attachment to your premises only.

8) No Service Commitment
This consent does not obligate you to purchase services. It enables construction so service may be made available.

9) Access Windows
Work will occur during reasonable hours. CNPI may access the property at any time for emergencies involving safety, service continuity, or network integrity. CNPI will provide reasonable notice for non-emergency visits where practical.

10) Indemnity & Liability
CNPI is responsible for direct, provable physical damage caused by CNPI’s negligence. CNPI is not liable for indirect, consequential, or special damages, and is not liable for damage to unmarked/incorrectly marked private facilities. Nothing in these Terms limits liability for gross negligence or wilful misconduct.

11) Term; Revocation
This licence remains in effect through installation and while CNPI facilities serve the premises. You may revoke this licence on 30 days’ written notice, except where access is required to maintain, repair, or safely remove facilities. This licence is not an easement or other interest in land.

12) Assignment / Subcontractors
CNPI may assign this licence to its affiliates and use authorized contractors to perform the work.

13) Privacy & Contact
Information is collected to plan locates, schedule, and perform installation/maintenance and may be shared with contractors and utility/infrastructure owners for those purposes. A copy of your submission will be emailed to you.

14) Governing Law
Province of Ontario.